If you pre drill the boards use one as a pattern and drill the rest of them on a flat horizontal surface.
How to install board and batten siding on a barn.
In addition to applying stain to both sides and all edges nailing both boards and battens correctly also is key.
It is likely that the lumber will be well air dried within the 30 days or mid august.
1 gallon size http amzn to 2diahys 1 quart size http amzn to 2dkvkto one mans.
Line up the panel with the edging and use screws to secure it in place on the nailing strip.
Like many types of siding you ll start installing the board and batten panels from one side.
Centering the fasteners allows the boards to expand and contract without bowing or splitting see diagram below.
The boards will typically try to cup as they dry.
Jam them up tight and put the batten on so that the nail hits between the two boards.
Rdesigns suggests the traditional method.
You nail through the batten to only one edge of the board and let the other board edge float under the next batten he writes.
Secure these boards using fasteners fasteners placed at the center of the siding boards.
On wide boards 12 or wider put 2 nails about 2 to 3 inches apart in the middle there is some argument on whether battens should be 2 or 3 wide.
Board and batten can be installed onto solid plywood or osb sheathing.
With a helper expect to spend a day installing 800 square feet of siding.
To install board and batten siding start with installing wide vertical boards spaced approximately one board width 7 8 apart.
Use a 4 foot carpenter s level to keep the boards vertical.
Ger your anchorseal here.
When putting up the boards pay careful attention to the growth rings.
The next panel will fit over the edge of the previous one disguising the nailing strip and lock securely into place.