Use a tin snips to cut the drip edge to size.
How to install a heavy fixture on a wooden roof.
Install the roofing screws vertically along each rib in the panel.
Secure the screws but do not overtighten.
Measure the ceiling junction box or j box you will use for the project.
Attach a joist hanger to each end of the 2x4 keeping them flush not protruding past the end of the wood.
Pick up a pack of strong earth magnets from your local craft store then hot glue them to the bottom of the small stick or dowel that s about 2 to 3 in 5 1 to 7 6 cm long.
Working through the channel measure the distance between the joists and cut a 2x4 to this length.
Do i have to somehow install a box if so my concern is that the drilling is right in the middle of the beam the beam is a direct support for the roof.
All suggestions are appreciated would really prefer suggestions from.
Place first plank flush against wall and nail into ceiling with a finishing nailer.
Install the drip edge on the gable ends of the roof after you finish installing your underlayment.
Nail it every couple of feet.
Start on side of room that is most visible.
If you are installing the chandelier in place of an existing fixture a j box will be present.
J boxes contain all the wiring connections you need to run electricity to the chandelier and they are designed in different models that support a finite amount of weight.
Glue a strong magnet to the end of a small stick or dowel.
Start at the bottom side of the gable and overlap the sections of drip edge a few inches as you work your way up the roof see figure a.
Wait for the glue to dry completely so you can use the stick as an impromptu stud finder.
Attach a fan rated outlet box to the midpoint of the 2x4 where you want the fixture to be.
Walk down the hardware aisle of any home center and you ll find an overpowering array of wall anchors and picture hangers.
The washer under the screw head should seal to the surface of the panel without bulging or shifting.
While it s easy enough to drive a nail or screw into a stud you may not know how to secure items to the wall between studs or in hard surfaces like brick or concrete.
Place the first screw about 7 inches from the bottom and each subsequent screw about 18 to 24 inches apart along the vertical run.
I have a wire running through an all wooden beam i would like to install a light fixture.
Climb a stepladder and locate the ceiling joists on either side of where you wish to mount the heavy ceiling light fixture.
Read on to find out about using wall anchors and picture hangers in your home.