How to install a corrugated metal roof on shelterlogic.
Corrugated metal roofing can be a convenient and relatively affordable way to provide protection without the need to install metal shingles.
The insulation board is installed to provide a buffer zone to allow for a gradual temperature change to occur thus minimizing the formation of condensation.
Lay the remainder of the row.
Next pre drill holes on the end and side ridges of the panels spacing the holes 6 to 8 inches apart.
Another benefit of using staples is that they do not make a large hole when penetrating into the sheathing.
Used what pieces i had left of a shelter logic garage frame to build a quick metal shed shelter.
You can easily go through several sheets of insulation and know that they are secure.
After a windstorm ripped the canvas covering from my portable shelter i replaced it with corrugated steel roofing.
Space the screws about 12 in 30 cm apart down the entire piece of metal.
To install corrugated roofing start by cutting your panels to length with an angle grinder.
Moreover a corrugated metal roof is highly durable and will last for decades.
Condensation forms on the inside surface of the metal roof panels when the warm moist air rises up from the ground and comes in contact with the cold roof panels.
Take your first sheet of metal and place it on the roof so that it overhangs the edge at least 3 4 in 1 9 cm.
Install the roofing screws vertically along each rib in the panel.
Align the first metal roofing panel so that it overlaps the edging by 1 2 to 3 4 of an inch and is square to the roof line.
Take care the first piece is aligned precisely perpendicular square to the edge.
The easiest and by far the quickest way to install metal roof insulation is with 1 inch staples.
Once the first sheet is in place you need to install the remainder of the lowest row of corrugated metal roofing.
Be sure the larger edge is laid so that the small edge of the next panel will overlap it.
The sheets should overlap by at least four inches add a bead of caulk where they overlap and at the other end of the building ensure there s an overhang of two inches.
To prevent it sailing away with the next windstorm i anchored the frame to the ground with 3 8 spiral ground anchor screws.
Beginning at the outside edge of your roof place each panel directly onto the purlins that are attached to the roof trusses.