Height of slate minus desired headlap divided by two gauge i e.
How to fit slate roof tiles.
These are made by removing 6 inches from the.
Step 3 starter strip.
Here you can find instructions for installing a slate roof repairing and restoring slate roofs and repairing asbestos roofs and ceramic tile roofs.
This is 20 ounce copper.
Join shingles with joints place the first line of shingles with the joints overlapped halfway.
How to install slate roof.
Form roof valleys form roof valleys but shingle it carefully to avoid.
Step 1 drilling the tiles.
Each slate tile needs to have a hole drilled through it so it can be nailed to the roof.
While edgemere tiles may look like natural slate the tiles are concrete and made in a factory so they have a consistent and predictable shape and size.
The place of drilling on slate tile depends upon the pattern you are going to make.
Use two tiles to determine the spacing required for the battens.
Slate roof central how to install a traditional american slate roof slate roof central is your center hub for all things related to natural quarried slate roofing.
Step 4 first course.
This means they are faster and easier to install helping roofing contractors increase their efficiency on site and also making them more cost effective.
Furring strips were nailed to roof with 2 5 inch hot dipped galvanized common nails.
So first find the pattern and then drill holes on the slate roof tiles.
A minimum of a 3 inch overlap is required for the tiles.
Drill the slate roofing slate tiles.
Should you need to re hole slates firstly we need to know the gauge calculate this by using the maths below.
The wood strips should be approximately 3 times the thickness of the slates.
Step 2 marking.
Install first piece of copper flashing over bottom of furring strips.
You can also consult the slate tile manufacturer regarding nail placing point on slate.
Install starter shingles first you need to install starter shingles.
Find the central point of lower edge of roof.
After you have determined the distance between the first two battens measure the distance and set battens using that.
You ll need to do this for.
For a 500mm long slate with a 100mm headlap the gauge is 500 100 400 2 200 so we know the gauge is 200mm.