The ambi dry verge is an easy to install dry fix verge system from redland.
How to fit dry verge to existing roof.
If working on a flex dry verge system ply the verge unit open and push it onto the tail of the first verge unit ensuring the end of the verge lines up with the end of the tail and nail the top into the batten end clip.
Be positioned off the wall e g.
A dry verge system that fits both the right and left hand side of the roof is also available for all other redland interlocking concrete tiles.
Tile batten overhang have an integral design feature e g.
Drainage channels that diverts water away from the wall.
A timber batten can then be installed running from the eave to the ridge to provide a base for the units to fix into.
Slide the starter insert into the channel of a dry verge.
The starter insert is a solid block that seals the first.
Screw the starter verge into.
Available in multiple colours to match tiles.
Nibs that keeps the verge unit away from the wall.
Position the second verge unit in the slots of the first one if the product features slots.
Fitting dry verge to old roof if you are fitting your dry verge to an existing building you need to remove all of the old underclock and motor bedding before fixing.
Have an integral design feature e g.
Battening setting out install the underlay according to the manufacturer s specifications.
Today we re showing you how to inst.
The nhbc recommends that the dry verge system should either.
Securing the starter verge 1.