Flip the topmost piece of the epdm material downward across the length of the roof.
How to fit a rubber flat roof.
Fill in any gaps in the roof with wood strips.
The material can now be rolled out and laid into the required position across the surface of the roof.
When a roof is abutting a wall at the perimeter of the roof allow 2mm per meter for the distance that the roof protrudes from the wall for expansion purposes.
Align the bottom so its parallel to the bottom length of the roof.
Epdm rubber asked for extra fall on roof to be made.
Step 2 roll out rubber membrane.
The seams must all be taped and sealed and then the rubber shingles can be nailed down on top in rows.
Also apply the contact adhesive to the back of the rubber membrane.
Using scissors cut off any excess epdm rubber roof membrane leaving 50mm overhang approximately.
Leave the material for the next 20 30 minutes to let any folds or creases fall out.
Afterward flip the next topmost piece upward.
Lay down the square folded epdm material in the center of your flat roof.
Position the epdm membrane.
Also apply the contact adhesive to the back of the rubber membrane.
If you have a flat roof and want a more attractive option it is possible to apply rubber shingles on top of the rolled rubber roof.
Repeat the process for the other half of the roof.
A rubber roof will not hold up to spans of more than 1 4 inch in size.
A broom or leaf blower to ensure the surface is clean before beginning to fit your rubber roofing material onto it.
2nd storey loft extension flat roof firestone rubber epdm 6 5m x 3 5m 2018 3750.
The rubber material will not hold to any gaps more than a quarter of an inch in size.
For a epdm rubber flat roof you will need.
Apply contact adhesive to roof perimeter apply a thin coat of contact adhesive to the roof deck perimeter approximately 150mm width and any vertical upstands.
Fold back half of the epdm rubber roof membrane to expose the timber deck underneath and apply the quickbond 1600 evenly with a roller.
Fold the membrane back on itself and fix with trims.
This could be branches leaves rocks or anything like that.
Rubber roofs are one of the more inexpensive and durable options for flat roofs.
Norton lancashire flat roof 3 metres x 5 metres.
Apply contact adhesive to roof perimeter apply a thin coat of contact adhesive to the roof deck perimeter approximately 150mm width and any vertical upstands.
Let is sit on the roof for 30 minutes.
Roll the membrane back into a position while the adhesive is still wet use a soft broom to ensure no air is trapped underneath the membrane.
Open the epdm square vertically along the length of the roof.
Starting at one side of the roof roll out the rubber roofing materials.
Special scraper square nose spade or shovel to remove old roofing material.
Osb and ply gaps leave a 3mm gap between all edges of any 8 x 4 board if the roof is very large or unusually long check that you don t need expansion breaks as well.