Then slide the tool horizontally along the lock to release it.
How to extend vinyl siding at the bottom.
Can i replace just the damaged pieces.
For vertical siding install j channel trim.
Our new to us 1930 s home has vinyl siding but the bottom row of the siding doesn t extend down far enough see photo.
I have extra siding pieces left behind by the previous owner.
The grey color visible in the picture is the back side of the vinyl siding.
Maintaining good clearances between finish grade and siding materials of all kinds is crucial to preventing this kind of damage.
Nail in the center of the starter strip nailing slots.
If you lift the bottom of the already installed siding then slip the new piece in that should get it.
The siding should have a nailing strip at the top edge.
Start fastening vertical siding and corner posts in the top of the uppermost slots to hold them in position.
At the bottoms of windows install under sill trim for horizontal siding and j channel trim for vertical siding.
For horizontal siding install f channel trim at the soffit and gable rake.
Nail every 12 inches on center.
Place all other fasteners in the center of the slots.
Center the fasteners in the slots to allow for expansion and contraction.
It looks like the house had some kind of yellow cement board material installed over wood originally and then vinyl siding was installed over that.
They are at the bottom near the ground.
Keep the ends of starter strips at least 1 4 6 4mm apart to allow for expansion fig.
Start fastening in the center of the panel and work toward the ends.
For insulated siding the.
To remove a piece of siding that s already nailed up slide the zip tool available at any home center under the butt edge of the siding hook the locking edge and pull down.
Install trim under eaves rakes.
In most cases it doesn t make any difference whether the siding is wood vinyl aluminum stucco or brick.
Lift the unlocked siding to expose the nailing hem of the siding piece below.
Using the chalkline as a guide install the top edge of the starter strip along the chalkline nailing at 10 254mm.