The most important reason to connect the gutters with downspout extensions is water damage to the roof.
How to connect gutter to lower gutter.
A steep roof covering a house has a larger area and.
Join gutter lengths using seamers directions printed on bag or slip joint connectors for ease of installation gently pry open fl anges fig.
When all the water from the upper roof gets collected in the gutters and comes down the downspout it has built up a little speed and force.
Some homeowners feel that a gutter running across a roof especially at the front elevation messes with the curb appeal of the house.
Insert an elbow up one inch into the bottom of the funnel shaped opening on the gutter which is called a gutter outlet.
Why connect the gutters using downspout extensions.
Begin at end of gutter run opposite downspout end.
The photo at the top of the page is one example of a upper gutter draining into a lower one neatly coming down tucked around the side wall and not calling attention to itself.
Purchase enough downspout leader to reach from the upper roof gutter to the lower roof gutter as well as from the.
Gutters connect by cutting 3.
Measure the area of each roof section to calculate gutter size.
Attach to end of gutter.
Of overlap snap the front flanges together and screw the overlap together with sheetmetal screws.
We always suggest connecting the upper level gutters into the lower level gutters using downspout extensions for many reasons.
Apply seamermate to end cap.
If you have a straight run gable roof measure from shingle to shingle and then add 1 2 inch to each side for a slight overlap.
Measure the total run of the gutter length you need.
Step 2 insert a 3 4 inch sheet metal screw through the front of the gutter outlet using a screwdriver so that it penetrates the elbow and holds it in place.
If you have inside corners subtract 5 inches.
Upper to lower downspouts and valley can concentrate water into one area that needs special attention to minimize the amount of water that could over flow.
For outside corners measure from corner to corner.
Then set the new length of gutter into the installed length with about 5 in.
Where the gutter wraps around an outside corner first attach splice fittings to the corner piece with rivets connect one splice to the preceding length of gutter apron.